Mohammed Koudeekhah

Engineering Mindset | MEP/HVAC

DeutschEnglish
All projects

CASE STUDY

MEP/HVAC course project: Office building

Online course project · Cairo, Egypt · approx. 700 m²

Total cooling load incl. outdoor air
approx. 89 kW
Rooms
15
System variants
2
Design friction rate (equal friction)
approx. 0.65 Pa/m

Tools · Carrier HAP · AutoCAD · McQuay DuctSizer

01

The project

Online course project: MEP/HVAC design for an office building in Cairo (approx. 700 m², 15 rooms) – from the load calculation through two system variants to the ventilation and system drawings.

Project type
Online course project
Location
Cairo, Egypt
Area
approx. 700 m²
Rooms
15
Software
Carrier HAP, AutoCAD, McQuay DuctSizer
Course / provider
Online training course in MEP/HVAC design (course project)
Year
2026

FIG. 01.01 — Ground-floor plan with the 15 conditioned rooms G01–G15 and their areas

Building
Office building, Cairo
Area
approx. 700 m²
Rooms
15
Software
AutoCAD

02

Understanding the demand

Calculated cooling and heating loads for 15 rooms with Carrier HAP.

Took areas, façades, windows and occupancy for each room from the floor plan myself; reference values (including lighting) came from the ASHRAE Handbook Fundamentals.

approx. 89 kW

Total cooling load incl. outdoor air · sum of the cooling coil loads of all 15 rooms from HAP

FIG. 02.01 — Cooling load per room (HAP, incl. outdoor air) compared with the selected unit capacity at 43 °C, Variant B

Software
Carrier HAP
Total cooling load incl. outdoor air
approx. 89 kW
Rooms
15

FIG. 02.02 — Space input in Carrier HAP 4.9 for G08 office: area, ceiling height, outdoor-air requirement per ASHRAE 62.1

Software
Carrier HAP
Inputs
Area, façade, windows, occupants
Source
Own take-off from the floor plan
Reference values
ASHRAE Handbook Fundamentals

FIG. 02.03 — Exterior walls and windows of G08 by orientation (S, W, NW)

Software
Carrier HAP
Room
G08 Office Room

FIG. 02.04 — HAP sizing result for G08: 27.4 MBH (≈ 8.0 kW) cooling coil load, 1,130 CFM supply air, 91 CFM outdoor air

Software
Carrier HAP
Room
G08 Office Room

03

Evaluating the variants

Two system variants for the same rooms: split units (wall-mounted and cassette units) and ducted ceiling units. Selected the units for each room based on the load and placed them in the floor plan.

VARIANT A

Split units (wall-mounted and cassette units)

FIG. 03.01 — Variant A: 17 split indoor units (10 high-wall, 7 cassette) with outdoor units

Software
AutoCAD
Selection
per room, based on load
Unit types
Wall-mounted and cassette units
Selection
per room, based on load
Number of indoor units
17 (10 high-wall, 7 cassette units)
Air distribution
directly from the indoor units, no duct network
Assessment
Low design and installation effort, no ducts; air distribution depends on the unit position and the units are visible in the room.

VARIANT B

Ducted ceiling units

FIG. 03.02 — Variant B: 17 ducted ceiling units, each with its own supply duct network and ceiling diffusers

Software
AutoCAD
Selection
per room, based on load
Unit types
Ducted ceiling units
Selection
per room, based on load
Number of indoor units
17 ducted ceiling units (2 each in G12 and G15)
Air distribution
Duct network, equal friction (see 04)
Assessment
Air distributed through several ceiling diffusers per room, units hidden above the ceiling; more design effort (duct network, diffusers) and space needed in the ceiling void.

Both variants cover the cooling loads of all 15 rooms with 17 indoor units each. Variant A needs no duct network: wall and cassette units supply the air directly into the room. Variant B distributes the air through its own supply ducts and 38 ceiling diffusers, with the units hidden above the ceiling – at the cost of more design effort. Only for Variant B did I also design a separate outdoor-air system. A cost or energy assessment was not part of the project, so I do not pick a winner.

I selected the ducted units by the supply airflow required by HAP and then checked total and sensible cooling capacity at 43 °C outdoor temperature. In small rooms (G02, G06, G10) even the smallest available unit exceeds the demand.

FIG. 03.03 — Required supply airflow (HAP) and airflow of the selected units per room, Variant B

Variant
B
Checked at
43 °C outdoor temperature

04

Designing the air distribution

Sized the duct network of the ducted-unit variant with McQuay DuctSizer using the equal friction method.

approx. 0.65 Pa/m

Design friction rate (equal friction) · 0.08 in.WC/100 ft; not the external static pressure

FIG. 04.01 — Detail G15 conference hall: two ducted units with supply ducts, airflows (CFM) and duct sizes (inches), sized with the equal-friction method

Method
Equal friction
Software
AutoCAD, McQuay DuctSizer
Design friction rate (equal friction)
0.08 in.WC/100 ft
Metric
approx. 0.65 Pa/m
Area
G15 Conference Hall

FIG. 04.02 — McQuay DuctSizer, G15 main duct: 1,345 CFM at 0.08 in.WC/100 ft gives 24″ × 10″; actual friction loss 0.072 in.WC/100 ft (≈ 0.59 Pa/m)

Software
McQuay DuctSizer
Method
Equal friction

05

Outdoor air and outlets

Outdoor air is supplied through a separate system: an outdoor-air fan and its own duct network supply all 15 rooms with a total of 1,776 CFM (≈ 3,020 m³/h). The outdoor-air rate per room comes from HAP (ASHRAE 62.1: 5 CFM per person + 0.06 CFM/ft²); the sum of the room branches equals the airflow in the main duct exactly. The return air of the ducted units flows back through return grilles in the ceiling; a separate return-air duct network was not required. An exhaust-air system was not part of this project.

FIG. 05.01 — Separate outdoor-air duct network: 1,776 CFM (≈ 3,020 m³/h) from the outdoor-air fan to all 15 rooms

Content
Separate outdoor-air duct network
Airflow
1,776 CFM (≈ 3,020 m³/h)
Rooms
15
Software
AutoCAD
Outdoor air per room (Carrier HAP)
Outdoor air per room (Carrier HAP)
RoomNameOutdoor air (m³/h)Outdoor air (CFM)
G01Conference Room207122
G02Office Room4627
G03Office Room10461
G04Office Room12272
G05Training Room9355
G06Office Room4426
G07Office Room13177
G08Office Room15591
G09Office Room14183
G10Office Room4426
G11Office Room5432
G12Reception Area690406
G13Training Room11467
G14Office Room9556
G15Conference Hall977575
Total≈ 3,0201,776

06

Technical results

Created ventilation and system drawings in AutoCAD (2D).

Total cooling load incl. outdoor air
approx. 89 kW
Rooms
15
System variants
2
Design friction rate (equal friction)
approx. 0.65 Pa/m
Drawings
Ventilation and system drawings, AutoCAD (2D)

07

What I learned

The office building was my first complete HVAC project, so I learned a lot:

  • Calculating cooling and heating loads: how people, lighting, equipment, exterior walls and windows contribute to a room’s load.
  • Working with Carrier HAP: entering spaces, reading the reports and selecting suitable units from them.
  • Planning air distribution: placing air outlets and sizing the duct network.
  • Drawing more efficiently: many steps in AutoCAD repeat constantly – copy, move, undo. Even with keyboard shortcuts this took time, so I assigned these frequent commands to the mouse buttons and the side scroll wheel.How my mouse workflow works
Next projectMaster’s project Nuevo35