CASE STUDY
MEP/HVAC course project: Office building
- Total cooling load incl. outdoor air
- approx. 89 kW
- Rooms
- 15
- System variants
- 2
- Design friction rate (equal friction)
- approx. 0.65 Pa/m
Tools · Carrier HAP · AutoCAD · McQuay DuctSizer
01
The project
Online course project: MEP/HVAC design for an office building in Cairo (approx. 700 m², 15 rooms) – from the load calculation through two system variants to the ventilation and system drawings.
- Project type
- Online course project
- Location
- Cairo, Egypt
- Area
- approx. 700 m²
- Rooms
- 15
- Software
- Carrier HAP, AutoCAD, McQuay DuctSizer
- Course / provider
- Online training course in MEP/HVAC design (course project)
- Year
- 2026
FIG. 01.01 — Ground-floor plan with the 15 conditioned rooms G01–G15 and their areas
- Building
- Office building, Cairo
- Area
- approx. 700 m²
- Rooms
- 15
- Software
- AutoCAD
02
Understanding the demand
Calculated cooling and heating loads for 15 rooms with Carrier HAP.
Took areas, façades, windows and occupancy for each room from the floor plan myself; reference values (including lighting) came from the ASHRAE Handbook Fundamentals.
approx. 89 kW
Total cooling load incl. outdoor air · sum of the cooling coil loads of all 15 rooms from HAP
FIG. 02.01 — Cooling load per room (HAP, incl. outdoor air) compared with the selected unit capacity at 43 °C, Variant B
- Software
- Carrier HAP
- Total cooling load incl. outdoor air
- approx. 89 kW
- Rooms
- 15
FIG. 02.02 — Space input in Carrier HAP 4.9 for G08 office: area, ceiling height, outdoor-air requirement per ASHRAE 62.1
- Software
- Carrier HAP
- Inputs
- Area, façade, windows, occupants
- Source
- Own take-off from the floor plan
- Reference values
- ASHRAE Handbook Fundamentals
FIG. 02.03 — Exterior walls and windows of G08 by orientation (S, W, NW)
- Software
- Carrier HAP
- Room
- G08 Office Room
FIG. 02.04 — HAP sizing result for G08: 27.4 MBH (≈ 8.0 kW) cooling coil load, 1,130 CFM supply air, 91 CFM outdoor air
- Software
- Carrier HAP
- Room
- G08 Office Room
03
Evaluating the variants
Two system variants for the same rooms: split units (wall-mounted and cassette units) and ducted ceiling units. Selected the units for each room based on the load and placed them in the floor plan.
VARIANT A
Split units (wall-mounted and cassette units)
FIG. 03.01 — Variant A: 17 split indoor units (10 high-wall, 7 cassette) with outdoor units
- Software
- AutoCAD
- Selection
- per room, based on load
- Unit types
- Wall-mounted and cassette units
- Selection
- per room, based on load
- Number of indoor units
- 17 (10 high-wall, 7 cassette units)
- Air distribution
- directly from the indoor units, no duct network
- Assessment
- Low design and installation effort, no ducts; air distribution depends on the unit position and the units are visible in the room.
VARIANT B
Ducted ceiling units
FIG. 03.02 — Variant B: 17 ducted ceiling units, each with its own supply duct network and ceiling diffusers
- Software
- AutoCAD
- Selection
- per room, based on load
- Unit types
- Ducted ceiling units
- Selection
- per room, based on load
- Number of indoor units
- 17 ducted ceiling units (2 each in G12 and G15)
- Air distribution
- Duct network, equal friction (see 04)
- Assessment
- Air distributed through several ceiling diffusers per room, units hidden above the ceiling; more design effort (duct network, diffusers) and space needed in the ceiling void.
Both variants cover the cooling loads of all 15 rooms with 17 indoor units each. Variant A needs no duct network: wall and cassette units supply the air directly into the room. Variant B distributes the air through its own supply ducts and 38 ceiling diffusers, with the units hidden above the ceiling – at the cost of more design effort. Only for Variant B did I also design a separate outdoor-air system. A cost or energy assessment was not part of the project, so I do not pick a winner.
I selected the ducted units by the supply airflow required by HAP and then checked total and sensible cooling capacity at 43 °C outdoor temperature. In small rooms (G02, G06, G10) even the smallest available unit exceeds the demand.
FIG. 03.03 — Required supply airflow (HAP) and airflow of the selected units per room, Variant B
- Variant
- B
- Checked at
- 43 °C outdoor temperature
04
Designing the air distribution
Sized the duct network of the ducted-unit variant with McQuay DuctSizer using the equal friction method.
approx. 0.65 Pa/m
Design friction rate (equal friction) · 0.08 in.WC/100 ft; not the external static pressure
FIG. 04.01 — Detail G15 conference hall: two ducted units with supply ducts, airflows (CFM) and duct sizes (inches), sized with the equal-friction method
- Method
- Equal friction
- Software
- AutoCAD, McQuay DuctSizer
- Design friction rate (equal friction)
- 0.08 in.WC/100 ft
- Metric
- approx. 0.65 Pa/m
- Area
- G15 Conference Hall
FIG. 04.02 — McQuay DuctSizer, G15 main duct: 1,345 CFM at 0.08 in.WC/100 ft gives 24″ × 10″; actual friction loss 0.072 in.WC/100 ft (≈ 0.59 Pa/m)
- Software
- McQuay DuctSizer
- Method
- Equal friction
05
Outdoor air and outlets
Outdoor air is supplied through a separate system: an outdoor-air fan and its own duct network supply all 15 rooms with a total of 1,776 CFM (≈ 3,020 m³/h). The outdoor-air rate per room comes from HAP (ASHRAE 62.1: 5 CFM per person + 0.06 CFM/ft²); the sum of the room branches equals the airflow in the main duct exactly. The return air of the ducted units flows back through return grilles in the ceiling; a separate return-air duct network was not required. An exhaust-air system was not part of this project.
FIG. 05.01 — Separate outdoor-air duct network: 1,776 CFM (≈ 3,020 m³/h) from the outdoor-air fan to all 15 rooms
- Content
- Separate outdoor-air duct network
- Airflow
- 1,776 CFM (≈ 3,020 m³/h)
- Rooms
- 15
- Software
- AutoCAD
Outdoor air per room (Carrier HAP)
| Room | Name | Outdoor air (m³/h) | Outdoor air (CFM) |
|---|---|---|---|
| G01 | Conference Room | 207 | 122 |
| G02 | Office Room | 46 | 27 |
| G03 | Office Room | 104 | 61 |
| G04 | Office Room | 122 | 72 |
| G05 | Training Room | 93 | 55 |
| G06 | Office Room | 44 | 26 |
| G07 | Office Room | 131 | 77 |
| G08 | Office Room | 155 | 91 |
| G09 | Office Room | 141 | 83 |
| G10 | Office Room | 44 | 26 |
| G11 | Office Room | 54 | 32 |
| G12 | Reception Area | 690 | 406 |
| G13 | Training Room | 114 | 67 |
| G14 | Office Room | 95 | 56 |
| G15 | Conference Hall | 977 | 575 |
| Total | ≈ 3,020 | 1,776 | |
06
Technical results
Created ventilation and system drawings in AutoCAD (2D).
- Total cooling load incl. outdoor air
- approx. 89 kW
- Rooms
- 15
- System variants
- 2
- Design friction rate (equal friction)
- approx. 0.65 Pa/m
- Drawings
- Ventilation and system drawings, AutoCAD (2D)
07
What I learned
The office building was my first complete HVAC project, so I learned a lot:
- Calculating cooling and heating loads: how people, lighting, equipment, exterior walls and windows contribute to a room’s load.
- Working with Carrier HAP: entering spaces, reading the reports and selecting suitable units from them.
- Planning air distribution: placing air outlets and sizing the duct network.
- Drawing more efficiently: many steps in AutoCAD repeat constantly – copy, move, undo. Even with keyboard shortcuts this took time, so I assigned these frequent commands to the mouse buttons and the side scroll wheel.How my mouse workflow works